top of page
CARLOTTA ROAD, DOUBLE BAY
A tough access side alley construction to prevent erosion. Scope of works include;
- Installing seven treated pine retaining walls, concreted in place
with treated pine posts.
- Installing 10 steppers concreted in place
- Installing organic topsoil, liriope and pine bark mulch to finish.
1/3
1/2
bottom of page